Timber frame extension.
Gaydon, Warwickshire
All trusses are now on and fixed.
As wel are the rafter and pre insulated cassettes on the long sloping roof that heads get the kitchen and front room. It’s now ready for marley weatherboard Cladding and roofing.
Valley construction joining the 2 roofs. Ready for valley boards and valley gutter.
Large sloping roof is constructed from pre insulated cassettes that fix together.
another picture of the timber frame work.