Second day for the crane and this time it was to lift up and in all the external wall panels. All panels are pre insulated and cut to size. This all go straight on the prefab floor and each panel is fixed to the next. Once these are up the internal stud work can be built to form the layout of the walls and rooms.not bad for 2 days work.