At last we had sunshine today.
After a long 2 days we have finally stripped all the felt and straw panels from the flat Roof and have only half of the pitched roof left to strip.
The flat roof at some point I think had been redone as the felt was nearly 50mm in places a took 3 of us to lift some sections off.
We plan to finish stripping the roof felt and remove all the joists tomorrow and then level bed the wall plates on Sunday. All work is still
On schedule and the progress is now moving at a greater speed thanks to the weather.