Crane arrived Onsite early this morning along with the delivery of prefab floor cassettes. The cassettes are made up a webbed floors joist with a 22mm chipboard bonded on top. 5 cassettes in total are used which all lock together when laid onto the wall plates to create the new floor. All flooring and someplace a were fitted today and it is now ready for the 1st floor wall panel to go on tomorrow
Joists
All posts tagged Joists
M Build. building maintenance & surface cleaning. covering all of Warwickshire.
2nd storey timber frame extension.
gaydon, Warwickshire.
At last we had sunshine today.
After a long 2 days we have finally stripped all the felt and straw panels from the flat Roof and have only half of the pitched roof left to strip.
The flat roof at some point I think had been redone as the felt was nearly 50mm in places a took 3 of us to lift some sections off.
We plan to finish stripping the roof felt and remove all the joists tomorrow and then level bed the wall plates on Sunday. All work is still
On schedule and the progress is now moving at a greater speed thanks to the weather.