So after a long 18 hour weekend on site, 5 men and 6 skips the roof covering and rafters are all off and the new wall plates are down.
All wall plates are within the +/- 5mm tolerance needed for the timber frame work and floor.
Crane arrives tomorrow and the new floor can go down.