Crane arrived Onsite early this morning along with the delivery of prefab floor cassettes. The cassettes are made up a webbed floors joist with a 22mm chipboard bonded on top. 5 cassettes in total are used which all lock together when laid onto the wall plates to create the new floor. All flooring and someplace a were fitted today and it is now ready for the 1st floor wall panel to go on tomorrow